Maintenance has been completed, other subsidiary facilities properly installed, the next most critical on the tennis court to do some of the surface. Although the basis of different, there are a number of different approaches, but also laying the products are not the same, but in general, the surface layer lay mainly in the following steps: 1. Site clean up
And repair the foundation: some potholes, depression repair, and clean or scour the entire site, to note that after the repair site, be sure to dry (usually 24 hours) before they can continue their work. 2. Shop adhesive layer: the basic needs of shop coat the surface adhesive that can bond closely to the cement surface at the same time
And the surface layer of plastic material closely, but also to prevent degumming, from skin problems. 3. Shop based Enhancement Layer: In order to enhance the field strength, smoothness and service life, the plastic surface of the main raw material acrylic and quartz sand, a certain proportion of water mixed into a lotion mixing, laying the presence of the ground